Include measures covering works before dismantling (enclosed drawings TD.01 & TD.02). Progress hanhpha unloading roof section, the body to complete the 1st floor cos background of existing buildings, machinery foundations and demolition waste shipped off site.
- Party B is allowed to use the whole of the construction materials demolition as follows:
+ System purlins Roof tiles and iron and wood of all kinds,
+ System old doors and windows,
+ Steel in Concrete ,.