Hey fabian,Permission was introduced, I was Raw-ceo of VRT.About the payment, I exchanged with the Bank open LC in Vietnam and they said LC can extend more time effect and the payment will perform when there is sufficient evidence from as required in the LC (46A-II). The documents required for the payment by the RRT provide and one voucher that is thereon.The minutes of trials will do the selling party (RRT) and the buyer (VRT) will confirm by signature, stamp if the content experience match your actual operating situation and the content of the signed contract.So, we wish you engineers through our cooperation with Vietnam in making sure the quality and experience to operate the machine as the agreement of the two parties in the contract.
đang được dịch, vui lòng đợi..
