To date, the contractor has delivered some sections and construction in progress on excavating and up the road. However, because of the lack of construction ground range should the roof taluy still could not execute and the contractor had to stop waiting for the process from the Original Quarter. In addition, in the area of tunnel to Underground Railroad bridge construction ground does lack the foot of wall space and serves construction measures (closing old Larsen, frame counter, formwork, etc.). So, since this time the contractor to stop construction because of the lack of premises,