Slip was moved from the tank at the pump through the house slip in cast shop. Pump system has the task of pumping to two blocks from Lake Bank (L & R) and four Beam (Casting tank) according to the pipe system. At the beginning of each bank, PLC system controls the pumping process to slip into the mold and discharge slip after the fill. Slip was discharged about following the other pipes on the back of the tank contains in SLip house to reuse