Before the tangent to the outer surface of the pipe location techniques need to wrap around a steel mesh layer cladding structure has a diameter of 1 mm before primers
Before the tiles on the outer surface of the position of technical pipelines must wrap around a mesh paneled structure with a diameter of 1 mm steel before primers