Article 5: content and workloadThe Contractor made the construction works according to design drawings (including amendment be approved by owner), technical guidelines to be approved by the owner, the standard rules, standards, regulations of the State quality assurance, schedule, pricing, safety and other agreements in the contract.Job content includes but is not limited to:a) Established the quality management system in accordance with requirements, the nature and the scale of construction works. Which regulates the responsibility of the individual parts of the construction works in the quality management of construction works;b) perform the experiment of materials, components, materials, equipment, work equipment, before construction and installation on construction works according to design requirements;c) Established measures for execution, the work progress;d) and log construction works according to the rules;e) test and implement safety measures, security, fire prevention, environmental hygiene inside and outside the school.f) internal testing;g) reported TVGS, the owner of the progress, quality, volume, labor safety and sanitation construction according to the requirements of the investor;h) preparing the document as a base test according to the current rules and/or at the request of the owner and request TVGS, the owner held trials;I) scope of work described in the items a, b, c, d, e, f, g, h, but does not exclude the responsibility of the contractor according to the current rules of the State;j) supplies, materials (accompanied by quality certificates, certificate of origin, the origin of the manufacturer) and the construction as content, specific workload are detailed in the Appendix.Article 6: requirements for product quality and product delivery, the construction contract.6.1. product quality requirements of the contract for the construction of:a) works must be constructed according to the design drawings (including amendment be approved by owner but do arise and work volume);b) contractors must give the owner of the material, products, samples of work completed.c) contractor to ensure supplies and equipment provided by the contractor have the origin as specified by the contract record.6.2. Checking, monitoring of the investora) owner is entitled to the place on the market and the place of extraction of natural raw materials of the contractor to test;b) during the process of manufacturing, machining, fabrication, and construction on the market, which is regulated in the contract owner is entitled to inspect, test, measure, test materials, and check the process of machining, manufacturing equipment, manufacturing of materials.6.3. The completed work:a) owner is just the product of the contract when the product of the work of quality assurance as specified in clause 6.1 above.b) product test base of the contract is the design drawings (including amendment be approved by owner); the technical presentation; the standard rules, the relevant standards; certificate of results of experiments; test record form is delivered. ...6.4. Test, Commission and other projectsAfter the work under the contract was completed to meet the requirements of the contract, the contractor will inform the owner to proceed with the company.After the works eligible for trials, delivery; the parties determine the reasons and stating the specific job that the contractor must do to complete the work.6.5. The liability of the contractor for the errors:a) By its funding, the contractor must:Complete the work outstanding on the date stated in the minutes of trials ", delivered in a reasonable time period that the investor requires.b) case does not fix the errors:If the contractor does not fix the flaws or damage was reported, the owner may: self work or hire someone else to repair and contractor must bear all costs.
đang được dịch, vui lòng đợi..