After finished positioning position the center of the pile, pipe walls down process is done by vibration equipment. There are 2 types of pipe diameter D = 1 m and 1.2 m.
After locating the position of Tam Coc finished, the lower casing is done by vibrating equipment. There are 2 types of tube diameter D = 1 m and 1.2 m.