CONSTRUCTING THE COVER AND IMPROVE THE MAIN WORK ITEMSIncludes the following work:1. Masonry2. wall Plastering 3. Baits matic 4. Paint inside and outside the home 5. The tile, tiling 1. Building works 1.1. Specification for building works. a. building Mortar.-The horizontal grout width: 15-20 mm.-Vertical grout width: 5-10 mm.-Time to allow use of the mortar after mixing no more than an hour.-The tiles are watered before building.-Construction of the Mortar will be mixed in the right proportions and digital island. b. building blocks.-To ensure the concrete texture links: before drilling into the concrete building two holes deep 7 cm, 8 2 plug fi stick 20 cm-long beard to do 10 fi wall built. The distance is 3, 4 m steel beard/3 = 1.1 m (5 rows of tiles).-Brick masonry and horizontal sequences will not be built too 1.5 m difference in height.-Tilt allows for the construction of the wall in a guaranteed floor under rules.1.2 preparing the ground.-Clean the toilet building location before construction.-Preparation of the seat to materials: bricks, mortar masonry-Preparing the tool contains coarse wood or built: coarse mortar religion.-Prepare 0.1 m3 to coarse material needs (size 50 x 50 x 40 cm).-The transport of material, from hoists in, from the mixer. The layout of the location for the mixer construction floor in large volume.-Providing for concrete construction of wet, water resources construction preparation. 1.3. Method of mixing mortar.-Making sand, cement under mass distribution level or levels to calculate the construction management agreed and monitored.-Use type B mortar mixer 251 mix dry according to the prescribed rate is then moved to the position of building and water to mix. 1.4. The sequence of construction.-Clean the surface.-Take the mold, spread a thick layer of mortar under 15-20 mm, miết thick vertical circuit 5-10 mm.-Build a class to test the heart essence, spread grout continuous to the next row until the core cylinder cars, then stop to wait for insert cylinder Bowl.-The next wall Built above the cylinder Bowl.1.5. As for the missed construction the dimensions of tiles will be cut the tiles to fit size building blocks.Follow the ISO regulations 4055-85 and mortar XD under TCVN 4459-87.The construction process is done only after you have removed the entire plant and formwork in it and must be built position toilet clean, used Trac bar fixtures high shaft, full heart. Turn the color cartridge connect the mold to correctly identify the location of the walls on the ground floor.+ Building: use only 75 grade tiles # type 1, standard size 6.5 * 10.5 * 22 cm. -Organization of educational system of higher education, building 1, 5 m.-On the use of steel scaffolding Minh khai Chinfon to construction or.-When built to stretch the wire 2 to ensure the flatness of the wall. To ensure speed of vertical plane wall must use Plumb and size nivô 2 m long.-Before the building is embedded water wet tiles to ensure moisture and strengthen the links of building blocks.-The building blocks to ensure dense, not veins, no pulse. Make sure the horizontal circuit along the circuit, 10 mm 10 mm. At the end of each construction must be checked and the heart essence of air monitoring stations.-The standby losses, electricity, water, ventilation, fire, information be located before the most recent tile demolition to avoid compromising the quality of building blocks. The electrical axis focus countries needed available before building the wall.-Maintenance of building blocks, according to the rules. When the new building should be built and cover the sunny rain, avoid shocks marks. Need lightweight rain spray a few times in the early days of building blocks to develop good intensity, avoiding the dried mortar correctly due to the water drain tiles. Construction of the mortar was ready digital type of gravel mixed, impurities, hotels. Do not use more than 1 hour, do not use the excess mortar back of previous batches. Grade level rate distribution and mortar right design.+ Do not go back on the newly built wall. Do not shock, vibrate switch, lean heavy objects to walls.2. plastering work-Plaster cement M50 # , 15, 20 must be ready for sand many times the type off the gravel hotels, impurities, finely mixed, use no more than 1 hour, do not reuse the excess mortar, the mortar mix of previous times.-Before finishing plastering must perform the following basic tasks:+ Locate and mold the entire wall before executing a warrant.+ Insert and insert all the waiting hole, hole electric water ... stucco concrete rubble.+ Wall plastering work was done after the wall has dried enough under the rules.+ Next to the column, the leading door ... to straight edge, square, right-angle pedestal bezel door are aligned to each other.+ Before the wall plastering must be clean and must be watered the entire wet surface with clean water. For the plastered area must be made meshing squares 1, 5x1, 5 m, use the dọi or to the benchmark survey of monitoring by the floor. From the standard mold of the proceeding for the other wall meshing. Plastering layer thickness guarantees in accordance with the requirements of the design, the legal process to ensure no birds, no cracks cuts flow, marks of plastering tools, uneven stain locally or other disabilities. The leading edge of the corner of the wall, the edge of the door is good, straight, perpendicular to each other. The wall plastered after 24 hours water spray must be legal according to the maintenance lasted several days.-The wall was plastered only when there has been rain-covered solarium.The work inspection in accordance with the current regulations: use size 2 m and light a torch to check the flat. Use ke 90o to check the angles of the wall together, taking the rod type to check the dense adhesion.3. The work of the son, baits3.1. Baits by the mixture of paints + white cement + admixture- Trước hết phải kiểm tra mặt tường: khô, bằng phẳng, đặc chắc, không nứt nẻ, không bong bộp... phát hiện chỗ nào có hiện tượng bong bộp phải dùng dao cắt chạy điện để loại bỏ và tiến hành trát lại, chờ vữa khô mới được tiến hành.- Làm vệ sinh, tẩy mài hết các sần sùi, bám bẩn, dầu mỡ...- Dùng vật liệu bả đùng thiết kế để bã vào mặt tường đã được xử lý. Vật liệu bả sẽ lấp đầy tất cả các khe hở, hết cả lỗ lyty và bù đắp tất cả lồi lõm. Dùng giấy giáp thô (số 2) đánh bóng bề mặt). Tiếp tục bả lần 2, đánh bóng bằng giấy giáp số 1, sau cùng bả lần thứ 3 - đánh bóng lần cuối bằng giấy bóng số 0.Lưu ý rằng, có thể dùng vải thô khô, sau đó với vải thô ướt để lau chùi mặt tường lan can ... thay cho giấy giáp mịn.3.2. Sơn nước lên mặt tường- Dùng sơn lót loại Onip-arcadia mat và sơn nội thất loại ORNesPaint, sơn 3 nước lên mặt tường ngoài, tường trong, cột dầm , trần, sau khi đã làm vệ sinh, lau chùi bụi bặm trên mặt tường đã bả. Sơn theo đúng chỉ dẫn của nhà sản xuất: về kỹ thuật sơn, thời gian sơn từng lớp, cách pha chế quấy trộn và chất dung môi để pha loãng khi cần thiết.- Phải chọn thời tiết tốt, khô ráo, không mưa bão, không nắng táp, không gió quá mạnh để tiến hành sơn... đặc biệt đối với sơn mặt ngoài. Khi gặp nắng giãi gắt gió to cần có biện pháp che chắn kịp thời.- Sơn rất kỵ hơi nước (độ ẩm lớn). Tuyệt đối không sơn lên mặt tường mới xây, lớp trát bả chưa thật khô, chân tường bị ẩm ướt.Khi sơn các kết cấu tiếp giáp mặt ngoài cần chọn lúc thời tiết tốt không sương mù ẩm ướt, không mưa nắng to hoặc gió lớn.Lớp sơn áp chỉ được tiến hành khi bề mặt đã được kiểm tra, các công việc chuẩn bị chu đáo được chủ đầu tư xem xét chấp thuận. Lớp sơn phủ cuối cùng sau khi sơn lót chỉ được tiến hành khi mặt tường, loại sơn, màu sắc... đã được chủ đầu tư kiểm duyệt.4. Công tác lát nền 1. Yêu cầu kỹ thuật :- Vật liệu lát bằng gạch Granit 500x500 cho các phòng, gạch chống trơn 200 x 200 cho khu vệ sinh là loại gạch lát cao cấp, yêu cầu kỹ thuật như sau:a. Sai số cho phép- Cao độ theo phương ngang trên bề mặt sai số cho phép 2 ~ 3 mm.- Không nhìn thấy bằng mắt thường. Mặt lát phải phẳng không gồ ghề lồi lõm cục bộ, kiểm tra bằng thước nhôm có chiều dài 2m, khe hở giữa mặt lát và thước không vượt quá 3mm. Độ dốc và phương dốc của mặt lát phải theo đúng yêu cầu thiét kế, kiểm tra độ dốc bằng ni vô, đổ nước thử hay cho lăn viên bi thép 10mm nếu có chỗ lõm tạo vũng đọng nước phải bóc lên lát lại.b. Hoàn thiện- Màu sắc và men gạch theo như bản vẽ. Các viên gạch lát phải vuông vắn, không cong vênh, sứt góc, không có các khuyết tật khác trên bề mặt, những viên gạch lẻ bị chặt thì cạnh chặt phải được mài phẳng. Chiều dày của lớp vữa xi măng lót không được quá 15mm, mạch gạch lát sàn : 1.5 mm và được chèn đầy bằng xi măng nguyên chất hoà với nước ( hồ nhão ).- Theo bản vẽ các đường lưới mực sẽ được đánh trên mặt sàn, trắc đạc cung cấp đường vuông góc cho mạch gạch trung tâm.- Trắc đạc sẽ đánh cốt + 600 mm trên mặt tường bao.- Mặt phẳng vữa lót sẽ được triển khai trước với cao độ tương đối chính xác cho công tác lát gạch theo như bản vẽ thiết kế.- Hàng gạch triển khai đầu tiên bắt đầu tại vị trí đường mực cho vuông góc và dây căng sẽ định vị đúng trên sàn. Mạch gạch thẳng hay cong sẽ được kiểm tra chặt chẽ cả hai phía.- Cao độ sẽ cố định theo đúng bản vẽ, cùng với việc dùng dây căng định vị hai đầu trên tường và dùng thước đo xuống.-
đang được dịch, vui lòng đợi..