After erection finished games we conducted beam bottom reinforcement beam erection. Threaded steel rod into the supports of the structure above, stirrup is counting enough structural steel inserted and collected into bundles matching the quantity of each piece then threaded steel rod bearing on stirrup.
- Laying stirrup structure designed and reinforced the strength required to make up beams stirrup according to design the structure and geometry.
- Withdrawal of support bars, lowered to the bottom reinforcement beams having arranged the calf Statistics Full cardboard bottom beams.
- Installation of the boards after finished erection of reinforced beams.
- Installation of reinforced tank lid: Reinforcement steel tank lid was erected after erecting formwork finished floor.