The next research direction:-End of front end project delivery button Crossroads at the head office in 54.84 + section construction of the main bridge P100 height 10.75 m head. In this position need to build the main bridge crossing serial Crossroads intersection to Lang road. Expected passage continued with the main bridge of about 1.2 Km.
đang được dịch, vui lòng đợi..