-When executing reinforced frame, forced to put the exact location Home essence, core and essence of standing frames. To make the armature not being skewed position while pouring concrete Tong, compelled forced reinforcement for truth sure. Want so, the deployment of reinforcement, reinforced belt holder standing frames, methods and equipment for the force, the dàicủa reinforced frame, measures -precautions deformed reinforced frame, the construction of reinforced connector, protective layer of the steel issue ... must be composed and thoughtful preparation. + Reinforced frame construction: -Reinforcement for piles are made into 11.7 m long segments, each segment is a steel cage consisting of 22 core bar along the Ø22, splice length stack is 900mm; ensure length 37m pile + 1 m hinges on the radio.weld length from 50 ÷ 200 mm; welding line height is 5 mm, reinforced circular steel Ø10 leaving belt in the distance a = 200 mm. -Just about 3 m back forced into cages 3 thick concrete pads about 5 cm round around to locate the cage reinforcement steel in drill hole, not for the reinforcement located into the pit when pouring concrete reinforced openings can do. -For a 2 m back create a Ø22 steel pipe reinforced belt.II. construction of reinforced frame 4.2.2:Location of reinforced frame tied right at the scene, then reinforced frame arrangement of generation and maintenance. Before drilling holes into steel reinforced frame drop, loading cranes used to position.Reinforced frame occupies a fairly large space so when the store is folded up into a pile, so we are forced to add reinforcement steel reinforced. But in order to avoid the incident causing the deformation of reinforced frames best we just lined up two floors.With a length of piles 37m need: steel cage 4:3 the cage length each cage 11, 7 m1 steel cage length 3.9 m
đang được dịch, vui lòng đợi..