The above prices include the cost of materials and labor in accordance with design drawings were approved by Party A. Do not include other costs incurred (these costs will be calculated separately for each specific case).
- Does not include the cost of tents, scaffolding, water and electricity in construction works.
- Price on the unit price under the contract volume, does not apply to items incurred (if any) during the construction process, there arise when two parties will agree on each specific charge.
- the B Signed received the A construction drawing within 03 days submit.