At present, contractors are preparing the work of casting reinforced concrete piles for thethe category of the flood wall and the basement wall in the package CW3A-project Urban Transportation Development District.According to the design of the prefabricated BTCT piles are neckties four corners 2 x 2 cm, the purpose of the roundings are intended to avoid chipping the edge transport process in pile and unloading. However, creating the outer edge of the star above the pile will do cost much of the time of construction and not take advantage of available formwork equipment on the market. At the same time, due to the construction of a new wall items commissioned on 03/03/2015, to accelerate the construction schedule and take advantage of be the source of available formwork equipment on the market, the contractor recommends no neckties the four corners of the concrete piles of two types and 40x40cm square piles 45 x 45 cm. If the pile would rupture the corner, contractors are committed to knocked out of the market right now.Dear Precious suggestion Board and supervising reviewed, approved, providing for contractors to accelerate the construction schedule, offset by the with the construction of console is slow.Best regards./.
đang được dịch, vui lòng đợi..