After you have completed the basic completion of rough construction, septic installation and supply pipes needed for toilet After completing the background wall and toilet need installation water supply pipeline
after having completed the basic completion of rough, septic tanks need to install water and sewage pipes to the toilet after the completion of the background and toilet walls need to laying water pipeline