The contractor performed the work of welding spots (3 equidistant points around the circumference of the tube) positioned between the pipe and coupling adjacent pipe sections near the bottom of the 06 that have not submitted any document or notice to the Investor, PMC before the construction and installation of the casing
đang được dịch, vui lòng đợi..
