THE SOCIALIST REPUBLIC OF VIETNAMIndependence-freedom-happiness-–-–-–-–-– o0oHanoi, Vietnam, on May 20THE MINUTES DELIVERED1 participants delivered:a party representative, assigned: protective equipment co., Ltd. and high-technology development the Arc de Triomphe.-Mr. and Mrs. Nguyen Van son position: staff.b, the beneficiary representatives: business incubator of high-tech.-Grandparents: Climax Xuan. Position: Technical Manager.2. content of delivery:STT content delivery unit number1 quality 1 batch records (original). Set 012 phase 2 quality records (copy). Set 01quality profile 3 phase 3 (original). Set 012 minutes of FIRE PROTECTION test signed July 1, 2015 (the original). A 013 FIRE Department's dispatch signed on Jan. 22, 2015 (original) soôố: 245/SCNCN FIRE PROTECTION-P6 A 014 minutes of test projects put into use (original) on 5 February, 2014. A 015 minutes of experience running an internal link that downloads (original). A 016 commissioning request contact with downloads (original). A 017 minutes of commissioning external loaded dynamically (original) A 018 minutes of commissioning external does not load (original). A 019 commissioning requirement related pedigree does not load (original). A 0110 minutes of commissioning external does not load (original). A 0111 report on the commissioning menu not loading (original). A 0112 Votes required commissioning menu not loading (original). A 0113 report on the commissioning menu not loading (original). A 0114 2 installments payment records (original). Set 0115 3 installments payment records (original). Set 0116 construction diary (copy). Set 01the completed drawing 17 (original) sets 01 The minutes are made in 4 copies are worth the same, each party keeping 2 copies.Party representatives get represented on the delivery
đang được dịch, vui lòng đợi..