Continue lifting up the package and install nacelle positions to ensure nacelle package openings than 500mm, stop. Putting into place the package installation and tighten bolts conducting connection between the cylindrical nacelle. In the process of hoisting equipment must use the vines to keep stability for the package.
Do the same for the 03 blade event
đang được dịch, vui lòng đợi..
